Case Study
Traincare Depot, WimbledonCore Details
SECTOR
DURATION
Contract Model
Challenges
- Working under extreme pressure and time constraints due to building delays that were out of our control.
- Works were not continuous as planned due to problems with the building structure delays.
The Brief
Calstan Mechanical were instructed by Osborne to carry out the installation of new High level suspended hot water radiant panels, flow & return stainless steel pipework and compressed airline modifications at Wimbledon Traincare Depot. This particular specification was for the provision and installation of new radiant heating, circulation pumps, air and dirt separator, pipework, insulation, control and isolating valves.
The Scope
Isolation and removal of existing services including draining down of the existing low and high temperature boiler room distribution pipework.
Supply & Install 24 Zehnder high level radiant heating panels on overhead suspension chains.
Supply & Install 250m of MTHW 50mm stainless steel pipework for the Flow & heating pipework connecting to and serving the high-level radiant heat panels.
Supply & Installation of LTHW train maintenance pit heating pipework.
Provide adaptations to the existing compressed airline system to allow new service pit design to operate correctly.
Supply & Install Thermal cladding & Insulation to the entire pipework run.
Test, Commission, set to work and carry out client demonstrations and training.
The Outcome
After the successful client demonstration and seamless handover of the installations, all involved parties expressed their satisfaction. It was evident that our meticulous planning and dedicated efforts had paid off, as the project was not only completed on time but also within the specified budget. The collaborative work ethic and effective communication throughout the process contributed to the overall success.
Client Feedback
The client expressed utmost satisfaction with our team’s successful handling of a highly sensitive project. The positive feedback emphasises our seamless collaboration, effective communication, and timely delivery, instilling trust and confidence in our capabilities.